California Memorial Stadium construction update

| | Comments (0) | TrackBacks (0)
This video was captured on Friday, Dec. 9 as construction continues on the California Memorial Stadium retrofit project. You can see the press box continues to take shape and one of the tower cranes has been disassembled. The second tower crane is scheduled to be dismantled this week.

Also, the steel braces are slowly being removed from the exterior of the perimeter wall to set the stage for the scheduled re-finishing of the wall.

Lots of noticeable progress. Check out the video.


0 TrackBacks

Listed below are links to blogs that reference this entry: California Memorial Stadium construction update.

TrackBack URL for this entry: http://cstv.collegesports.com/mt/mt-tb.cgi/28635

Leave a comment




THIS WEEK'S TOP POST